SAMPLE  Draft package for a REAL open RFQ, written for a fictional client← RFQwright home

RFQwright draft package · item #1 from this week's shortlist

Cleaning Agents: ICE Florence Service Processing Center, AZ

SolicitationRFQ 70CDCR26Q00000009 (Combined Synopsis/Solicitation, Amendment A00002), DHS / ICE, Detention Compliance & Removals
Set-asideTotal Small Business · NAICS 325611 (size standard 1,100 employees) · PSC 7930
Questions dueMon Nov 23, 2026, 3:00 PM CT, on Attachment 3 (Question Template)
Quote dueWed Dec 2, 2026, 12:00 PM CT, by email to both [email protected] (CO) and [email protected] (CS)
Email subject (required)Harbor Line Supply Co. RFQ for 70CDCR26Q00000009
Official noticeSAM.gov notice and attachments →
Bid / no-bid: BID, if you can install and service dispensers in Florence, AZ. It's a small-business set-aside for a 12-month base plus four option years, it's a good fit for a sanitation distributor, and the Q&A (answer #7) confirms you can supply through authorized distributors instead of making the chemicals yourself. Things to watch: (1) installing and servicing dispensers within 30 days of award, then monthly water-condition reports; (2) food-service products must be NSF and FDA approved (Q&A #8); (3) equipment and installation costs must be spread across the monthly chemical line items (Q&A #10); (4) anyone delivering must clear detention-facility security; (5) there's no minimum order guarantee (Q&A #2).

Checklist before you send

Draft 1: Questions to the contracting officer (paste into Attachment 3; due Nov 23)

#ReferenceQuestion
1RFQ p.1; SOW 9The RFQ says award is expected "on or before September 30, 2026," and Q&A #9 gives September 30, 2026 as the start date. Both dates have passed. What is the current expected award date and base-period start date?
2SOW 4.1, 4.3Can the Government share the current water hardness (grains per gallon) and confirm a water softener feeds the kitchen and laundry? We need this to choose product concentrations and set the dispensers before installation.
3SOW 5.0The SOW lists monthly quantities but says delivery will be "as needed in pallet quantities." Is a monthly delivery acceptable, or does the Government want fewer, larger deliveries? How much storage space is available at the loading dock?
4SOW 4.3At each dispenser location, will the Government provide 110V power and hot/cold water connections, or should the contractor include those tie-ins?
5Pricing; Q&A #10Should installation and equipment costs be spread over the 12-month base period only, or across the base period and all option periods?
6SOW 4.2Will the Government accept a dryer block with an equivalent fresh scent, if it meets every performance requirement, instead of "mountain fresh" specifically?
7SOW 6.0Do installation technicians need any clearance beyond photo ID, such as a background check or advance names list? If so, how much lead time is needed?

Draft 2: Volume I cover letter and technical approach (no pricing)

[Date]

Genna Braden, Contracting Officer
Briana Jones, Contract Specialist
U.S. Immigration and Customs Enforcement, OAQ / Detention, Compliance & Removals
500 12th St. SW, Washington, DC 20024

Subject: Harbor Line Supply Co. RFQ for 70CDCR26Q00000009, Volume I: Technical Capability

Dear Ms. Braden and Ms. Jones,

Harbor Line Supply Co. submits this quote for food-service and laundry cleaning agents, dispensing equipment and locking enclosures for the Florence Service Processing Center. We acknowledge Amendments A00001 and A00002 and quote against the revised Attachment 1 SOW.

Quoter: Harbor Line Supply Co., [street address, San Antonio, TX ZIP] · UEI: [UEI] · CAGE: [CAGE] · Small business under NAICS 325611 · Point of contact: [name, phone, email]

1. Products (SOW 4.1, 4.2). We will supply all twelve products from [manufacturer]'s institutional line, through our authorized distributor agreement (allowed under Q&A #7). Every food-service product is NSF-registered and suitable for food-contact use as required by Q&A #8. All products are phosphate-free where the SOW requires it and come in the container or capsule sizes the SOW lists. A product-by-product table with data sheets and SDS is attached as Exhibit A.

2. Dispensers and corrections-grade enclosures (SOW 4.3). We will install wall-mounted automated dispensers for the dish machine, pulper, pot/pan sink and laundry systems (4 kitchen dispensers and 1 laundry dispenser, plus 5 dryer-block mounts for ICE maintenance to install, per Q&A #1). Each dispenser will sit inside a stainless-steel enclosure with tamper-resistant locks and hinges. We will remove the outgoing contractor's equipment carefully, stage it for ICE to ship, and calibrate each new dispenser to the product and the site's water conditions.

3. Schedule. Within 30 days of award we will deliver one month's supply of every product, finish installation and calibration, and train kitchen and laundry staff on food safety and product use. After that, we will deliver regularly during warehouse hours (7:00 AM to 2:30 PM, Monday to Friday), sized to actual use. The quantities in Section 5.0 are estimates only.

4. Service and reporting. A technician will visit every month to check dispenser function, test water conditions (pH, hardness, pressure) and leave a written report for the COR, for use in state and federal audits. If something fails, we will respond the next day for laundry and the same day for the kitchen, as Q&A #6 requires. Maintenance, repairs and parts are included at no extra charge.

5. Security (SOW 6.0). Our delivery and service staff will carry valid photo ID, drive vehicles marked with our company name, follow escort instructions and bring no prohibited items into the secure perimeter.

6. Assumptions. [List any assumptions, e.g., the Government supplies 110V power and water at each dispenser location, pending the answer to Question 4.]

We have read and accept the terms of the solicitation and Attachment 2. Thank you for considering our quote.

Sincerely,
[Name], [Title]
Harbor Line Supply Co.

Draft 3: Volume II price sheet layout (you fill in the prices)

Base period shown below. Copy the same twelve lines for Option Periods 1 to 4. Unit price is per month and must include products, delivery, installation spread across the months, service and reporting.

#DescriptionFrequencyQtyUnitUnit priceTotal
1Dish Machine Liquid Conveyor Detergent & Lubricant~5 gal / month (5-gal container)12MO$____$____
2Dish Machine Solid Detergent~108 lb / month (8-10 lb capsule)12MO$____$____
3Dish Machine Solid Rinse Additive~2.5 lb / month (2-3 lb block)12MO$____$____
4Liquid Acid Lime Scale Remover~4 gal / month (1-gal container)12MO$____$____
5Pulper Machine Liquid Sanitizer~8 gal / month (1-gal container)12MO$____$____
6Recirculating Pot/Pan Sink Liquid Detergent~35 gal / month (5-gal container)12MO$____$____
7Pot/Pan Sink Liquid Rinse Sanitizer~15 gal / month (2.5-gal container)12MO$____$____
8Laundry Machine Solid Detergent~216 lb / month (8-10 lb capsule)12MO$____$____
9Laundry Machine Solid Destainer~40 lb / month (3-5 lb capsule)12MO$____$____
10Laundry Machine Solid Softening Sour~48 lb / month (5-7 lb capsule)12MO$____$____
11Laundry Static Control Solid Dryer Blocks~1,800 g / month (125-175 g block)12MO$____$____
12Liquid Drain Treatment~5 gal / month (2.5-gal container; unit confirmed as gallons in Q&A #11)12MO$____$____
Base period total$____
What RFQwright did vs. what you do: we read the RFQ, both amendments, the SOW and the Q&A and wrote the three drafts above. You choose the products, set every price, confirm you can do the installation and service in Florence, AZ, and email the quote yourself.

Draft based on public documents posted to SAM.gov for RFQ 70CDCR26Q00000009 as of Nov 21, 2026. Harbor Line Supply Co. is a fictional company used for illustration. RFQwright is a private company and is not affiliated with the U.S. government. We can't guarantee any award; the agency evaluates every quote on its own terms.